bus rapid transit done right

Found this article today and wondered how different many cities — like Seattle — would be if they have taken this approach.

Realising the importance of mass transit, planners called for the creation of subway lines, as well as widened streets for cars – but construction would be costly and could take decades to complete.
Instead, Lerner saw an opportunity in the one form of transport that many considered a lost cause: the bus. His idea was to devise a system that gave buses as many of the functional advantages of urban train systems as possible. He proposed to integrate dedicated bus lanes along the city’s main arteries, with stations placed on medians along the routes. This would allow buses to run at speeds comparable to light rail, while dramatically reducing the cost.

We already have bus rapid transit line corridors but they are not prioritized or treated differently. They’re just limited access bus lines.

Though the system wasn’t an instant success after the opening of the first line in 1974, it gradually worked its way into the livelihoods of residents. In 1979, Lerner created the Rede Integrada de Transporte (Integrated Transport Network) to better manage the system and, as new routes were added, it began to show its full potential. By 1993, it was carrying 1.5 million passengers a day.

So right about about when Seattle rejected a $900 million federal grant…

But high ridership created a problem. Buses in the system still used conventional boarding systems, where passengers entered through the front of the bus and paid fares on board. Lerner, who was back in office for his third term as mayor, came up with an elegant solution.

He called for a revamped station design that enabled faster boarding through multiple doors, and fares would be exchanged before entering the station – similar to subway or light-rail systems. Offboard payment would also allow for the creation of transfer stations, meaning one fare would cover the entire system. To top it off, Lerner gave the stations a distinctive look by placing them in futuristic glass tubes. These new “tube stations” debuted in October 1991 as part of the first Ligeirinho express line. Today there are 357 tube stations throughout the city.

Curitiba’s population has now swelled to over 1.8 million people – more than four times what it was when the BRT system first opened.

Imagine if Seattle was 4 times as populous/dense as it was in 1970 — it was about the same size as Curitiba at the time. Hard to imagine Seattle making room for 1.3 million people, given how people love their big houses on big suburban yards.